<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:g-custom="http://base.google.com/cns/1.0" xmlns:media="http://search.yahoo.com/mrss/" version="2.0">
  <channel>
    <title>standard-machine</title>
    <link>https://www.standardmachine.us</link>
    <description />
    <atom:link href="https://www.standardmachine.us/feed/rss2" type="application/rss+xml" rel="self" />
    <item>
      <title>One-Off Aerospace Parts: Why the Hard Ones Go Better When the Shop Talks to Your Engineer</title>
      <link>https://www.standardmachine.us/insights/one-off-aerospace-parts</link>
      <description>One-off aerospace parts go better when the shop talks to your engineer first: functional tolerances, workholding, machine-to sizes and the first article.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Who Builds One-Off Aerospace Parts and Prototypes in Aluminum
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Standard Machine and Manufacturing, a CNC machine shop in Greenville, Kentucky, builds one-off and low-quantity aerospace parts and prototypes in aluminum, and anodizes them in the same facility. Standard takes on the hard parts on purpose: deep pockets, thin walls, features that are hard to reach. Its machinists talk with the customer's engineer about how the part will be made before it is quoted, and complex work gets a risk review before a price goes back.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          That conversation is the difference. A complex part sent out for quotes tends to get one of two answers. Some shops no-quote it. Others quote it to print without a word about how it could be made better, and the engineer finds out what was hard about the design when the first part shows up late or wrong.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Engineers on both sides of the drawing describe the same gap. Machinists talk about parts that are "not manufactureable to the print" and about struggling with customers over what's on the drawing versus what they intended. Engineers say a quote is a commitment to make the part, so a shop that sees a problem should say so. And one line from an engineering forum sums it up: the quicker a question on a print is addressed, the better.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           Our
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/aerospace"&gt;
          aerospace precision machining
         &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           is built around that early question. One-off and prototype work is one end of how Standard runs. It goes to a machinist with deep experience, and it is treated as the opposite of production, not a small version of it.
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           Have a part other shops passed on?
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/start-your-rfq"&gt;
          Start your RFQ
         &lt;/a&gt;&#xD;
    &lt;span&gt;
          .
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What the Conversation Covers Before the Quote
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The engineer is asked which tolerances are functional before the part is cut. That one question changes a lot. A tolerance that matters gets held. A tolerance that came from a title block default gets a conversation, because it might be costing time on a feature nobody needs that tight.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The feedback comes before the quote, not after the first part. On a hard aluminum part it usually covers a short list:
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Workholding.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            A flat or a tab that lets the part be held without distorting it, removed at the end if the design needs it gone. Holding a thin part without bending it matters, for the reasons in
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
      &lt;a href="/insights/why-aluminum-parts-move-after-machining"&gt;
           why aluminum parts move after machining
          &lt;/a&gt;&#xD;
      &lt;span&gt;
           .
          &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Tool reach.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            How deep a pocket runs against how far a tool can reach without chatter, and whether a corner can open up to let a stiffer tool in.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Corner radii.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            Internal corners sized to a real cutter, not drawn sharp.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Edges.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            An eased-edges note on the drawing in place of tiny fillets modeled on every edge.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           None of it changes what the part does. Done well, it can make the part lighter and easier to machine, which on a flight part is a good trade.
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/machining"&gt;
          Our machining work
         &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           runs on the same habit for every complex job: ask before cutting, not after scrapping.
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          One Plate, Two Directions
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Aluminum plate carries stress from how it was made. Research from Oak Ridge National Laboratory found that the residual stress in the plate alone can distort a thin, high-aspect part beyond aerospace limits, and that parts cut from different spots in the same plate can move in opposite directions.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          On a production run, a shop learns how a part moves and adjusts. On a one-off, there is no second try. So thin-walled parts get planned for it from the start: walls are roughed and finished in steps rather than cut to full depth and skimmed, which keeps the part stiff while the most material comes off. Thin walls are common in aerospace parts, and vibration and deflection are the main reasons they fight back.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          The Prototype Does Not Count Toward the First Article
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          This catches people. The aerospace first article standard, AS9102, excludes prototype parts that are not part of the first production run. Primes call for the first article on product representative of the first production run. A prototype that proves the design still needs a production-representative first article later.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          So the smart move is to build the one-off the way production will run it, coating included. If the prototype is machined one way and finished somewhere else, and production does it differently, the first article is the first time the real route has ever been tried.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Machine-To Is a Number Someone Has to Own
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A coating applied after machining can defeat a tight tolerance and force test pieces, and test pieces are expensive when the run is one part. NASA's anodizing process specification asks for both the final and the machine-to dimensions on a hardcoat drawing, and for radiused rather than chamfered corners so the coating builds evenly.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          When the drawing gives only finished dimensions, someone still has to decide the machine-to size. On a part that will be hardcoated, we propose the machine-to dimensions and the edge radii to the engineer before the first cut. Because we anodize in the same facility, the shop that picks the number is the shop that has to live with it.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          The Straight Answer
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
          Will a shop that takes hard one-off parts make any part on the drawing?
         &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          No, and it shouldn't promise to. Some features cannot be made as drawn, and some can only be made at a cost the design does not need. What a good shop does is say so before the quote, explain why, and offer a version of the feature it can hold. A shop that quotes the impossible without a word has only moved the problem to the day the parts are due.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Questions Engineers Ask About One-Off Aerospace Parts
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          Does a Prototype Part Need a First Article Inspection?
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Not under AS9102, which excludes prototypes that are not part of the first production run. The first article comes later, on parts representative of production. Building the prototype the way production will run makes that first article far less likely to turn up surprises.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          Should the Machine Shop Suggest Design Changes?
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          On complex parts, yes, before the quote and with the engineer's agreement. Suggestions should keep the part's function and change how it is made: workholding, corner radii, tool reach, edge breaks. The engineer decides; the shop explains what each change buys.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Getting a Hard Part Made Right the First Time
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Send the model and the drawing together, and say which tolerances carry the function. Tell the shop whether the part will be coated and whether more will follow. Then expect questions back. A shop that asks good ones before quoting a hard part is a shop that has made hard parts before.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          How Standard Machine and Manufacturing Can Help
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           Standard Machine and Manufacturing builds one-off and prototype aerospace parts in aluminum, with a risk review on complex work and anodizing in the same Greenville, Kentucky facility. Start a project with us by
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/start-your-rfq"&gt;
          starting your RFQ
         &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           or
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/contact"&gt;
          reaching out directly
         &lt;/a&gt;&#xD;
    &lt;span&gt;
          . Call us at 270.377.7172.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/b2ffbbb7/dms3rep/multi/one-off-aerospace-bracket.webp" length="96084" type="image/webp" />
      <pubDate>Mon, 16 Nov 2026 18:00:05 GMT</pubDate>
      <guid>https://www.standardmachine.us/insights/one-off-aerospace-parts</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/b2ffbbb7/dms3rep/multi/one-off-aerospace-bracket.webp">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/b2ffbbb7/dms3rep/multi/one-off-aerospace-bracket.webp">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Low-Volume CNC Machining With Mil-Spec Anodizing, Finished by One Shop</title>
      <link>https://www.standardmachine.us/insights/low-volume-cnc-machining-mil-spec-anodizing</link>
      <description>Low volume CNC machining with mil-spec anodizing from one shop: why a short run is still a full MIL-PRF-8625 lot, and how reorders keep the same process.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Low Volume CNC Machining With Mil-Spec Anodizing, in One Shop
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Standard Machine and Manufacturing, in Greenville, Kentucky, machines short runs and prototypes of aluminum parts and anodizes them to MIL-PRF-8625 on its own line, so a small order ships as a finished, inspected part from one shop. A run of a few parts goes through the same process, the same inspection and the same paperwork as a run of a thousand.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The usual problem looks like this. An engineer has a handful of aluminum parts and a finish callout on the print. A volume machine shop quotes it reluctantly. The anodizer has a base charge that covers far more pieces than the order holds, the kind machinists call a lot charge. Then a finish promised in a few days takes a few weeks.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           Short runs are not a side job here. Our
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/machining"&gt;
          low volume CNC machining
         &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           is one end of how Standard runs: big repeat orders at one end, and few-off parts that need an experienced machinist at the other. A good deal of the work is prototype quantity, two of one part and four of another, for a customer that builds automation equipment.
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           Have a short run with a finish callout?
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/start-your-rfq"&gt;
          Start your RFQ
         &lt;/a&gt;&#xD;
    &lt;span&gt;
          .
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          A Small Lot Is Still a Whole Lot
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Under MIL-PRF-8625 (still written MIL-A-8625 on plenty of drawings), a lot is every part of one part number anodized in the same tank, by the same process, and offered for acceptance together. Five parts or five hundred, it is a complete lot. It gets accepted the same way.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Process control tests run on a fixed schedule whatever the lot size. Type III thickness is measured, by eddy current or by cross-section. Dyed Class 2 color is checked at lot acceptance under the current revision. None of that work shrinks when the part count does, which is why anodizers carry a base or lot charge. It isn't a penalty for a small order. It is the cost of treating three parts as a real lot.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           On our own
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/anodizing"&gt;
          MIL-PRF-8625 anodizing line
         &lt;/a&gt;&#xD;
    &lt;span&gt;
          , a short run gets exactly that treatment:
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           The same process
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            as a production lot of the same part.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Thickness measured
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            wherever Type III is called out.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Color checked
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            on dyed lots against the drawing.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           A certificate of conformance
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            with the part number and revision, PO, quantity, lot, a statement of conformance, a signature and a date.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           Every lot ships with
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/quality"&gt;
          paperwork that traces to the parts in the box
         &lt;/a&gt;&#xD;
    &lt;span&gt;
          , whether the box holds four parts or four hundred.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Color Across Reorders
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A reorder of three parts, months after the first five, is where finish problems like to hide.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Finishers advise sending all of a job's finishing to one anodizer, because metal anodized on different days is hard to match, and a different shop is one more variable on top of that. Different alloys anodize at different voltages, so they are not run in the same tank. And when a reorder goes to whichever anodizer has room that week, the second lot can come back a shade off the first.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          At Standard a reorder runs on the same line and the same process as the first lot. That doesn't make two lots identical. The metal itself varies by mill lot. What it removes is the finisher as a variable. When color matters, sending a part from the earlier batch as a reference is still the best habit there is.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Bridge Parts Are Customer Parts
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Bridge production is the stretch between prototype and volume: production-quality parts, made before the volume tooling or supplier is in place. The risk is treating those parts like prototypes when they are going to customers.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          On an aerospace job, anodize is a special process, and the certificate is what proves it was done to spec. A certificate of conformance is a declaration, not a data package, so it needs to be right. A short run that ships to a customer needs the same paperwork as the production lot that follows it, and gets it here.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          And plenty of short runs are the front end of something bigger. Engineers on the forums describe it the same way: a few parts now, with the possibility of growing into larger quantities. When that happens, the parts that grow should be the same parts. A short run machined and finished by the shop that would run the volume carries its route forward, so the first production lot is not the first time anyone has tried that route.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          The Straight Answer
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
          Does a short run cost the same per part as a production run?
         &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          No. A lot carries fixed work (racking, testing, inspection, paperwork) that does not shrink with the part count, so a few parts carry more of it each. What a short run should not get is a different process. The parts, the inspection and the certificate should be the same as they would be at full volume.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Questions Engineers Ask About Short Runs
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          Can a Prototype Run Be Anodized to MIL-PRF-8625?
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Yes. The specification defines a lot by part number, tank and process, not by quantity. A prototype run is anodized, tested and accepted as its own complete lot, with the same certificate a production lot would carry.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          Will a Reorder Match the First Lot's Color?
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          It gets closer when the same shop runs the same process, but no one can promise an exact match. Color varies with the alloy, the temper and the mill lot. Sending a part from the first batch as a reference gives the reorder a target.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Specifying a Short Run So It Ships Finished
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Put the whole finish callout on the print: the specification, type and class, the color, and the thickness on Type III. Note the alloy and temper. Say whether the parts need a certificate and what it should carry. Then ask for the machining and the finish on one quote.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          It also helps to tell the shop the quantity you need now and the quantity you expect next. A run of six that might become six hundred is quoted and planned differently from a run of six that ends there, and we would rather know which one we are building.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          We check the finish callout when the job is quoted, so the lot is built to it from the first cut. If the print leaves something open, such as a color with no reference or a Type III part with no thickness, we ask before we program the part, not after it comes out of the tank.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          How Standard Machine and Manufacturing Can Help
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           Standard Machine and Manufacturing machines short runs and prototypes in aluminum and anodizes them to MIL-PRF-8625 on its own line in Greenville, Kentucky, so a small order ships as one finished part from one shop. Start a project with us by
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/start-your-rfq"&gt;
          starting your RFQ
         &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           or
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/contact"&gt;
          reaching out directly
         &lt;/a&gt;&#xD;
    &lt;span&gt;
          . Call us at 270.377.7172.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/b2ffbbb7/dms3rep/multi/small-batch-rack-leaving-tank.webp" length="49316" type="image/webp" />
      <pubDate>Mon, 09 Nov 2026 18:00:04 GMT</pubDate>
      <guid>https://www.standardmachine.us/insights/low-volume-cnc-machining-mil-spec-anodizing</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/b2ffbbb7/dms3rep/multi/small-batch-rack-leaving-tank.webp">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/b2ffbbb7/dms3rep/multi/small-batch-rack-leaving-tank.webp">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Anodizing for Machine Shops: A Finishing Partner That Machines Parts Too</title>
      <link>https://www.standardmachine.us/insights/anodizing-for-machine-shops</link>
      <description>Anodizing services for machine shops from a finisher that machines too: contact marks set on the print, masking and marking in one visit.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Anodizing Services for Machine Shops, From a Shop That Reads the Print
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Standard Machine and Manufacturing anodizes aluminum parts for other machine shops through BluArc, its anodizing division in Greenville, Kentucky. Because BluArc sits inside a working machine shop, the parts are handled by people who read the same prints and hold the same gauges as the shop that cut them. They know which surfaces are functional, where a contact point can go, and what a tolerance means once the coating is on. Masking and laser marking happen in the same visit.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Plenty of machine shops send their anodizing out. That part is normal. The trouble starts when the parts come back with a rack mark on a sealing face, a bore that was supposed to stay bare and didn't, or a batch that went wrong and an explanation that amounts to "it happens."
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           That gap is what our
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/anodizing"&gt;
          anodizing for machine shops
         &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           is built to close. BluArc started out finishing Standard's own parts. Then it opened to outside shops, and now it runs their work alongside ours. A few of those shops found out afterward that we machine too, and started sending parts to be cut as well as finished.
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           Sending parts out for anodize?
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/start-your-rfq"&gt;
          Start your RFQ
         &lt;/a&gt;&#xD;
    &lt;span&gt;
          .
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          The Purchase Order Is the Contact-Mark Spec
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Every anodized part touches the rack somewhere, and the spot where it touches stays bare. Think of it as a fingerprint. Every part gets one. The only question is where it lands.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A part racked on an exposed surface nearly always shows a mark there. Type III hardcoat needs a firmer grip on the part than Type II, so its marks are larger. And no standard fixes how big a rack mark may be. MIL-PRF-8625 puts the location of contact marks in the buyer's ordering data when it matters to the part's function, which means the purchase order is the only place that requirement lives. If the PO says nothing, the anodizer decides.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           So the advice machinists give each other on the forums is the right advice: send a print showing where the parts can be racked, and talk through expectations before the run. At BluArc that conversation is the default. We ask for the print, not just the parts, and propose contact points on non-functional features before anything goes on a rack. Coating growth on threads and bores gets the same look, for the reasons we laid out in
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/insights/how-anodizing-changes-part-dimensions"&gt;
          how anodizing changes the dimensions of a machined part
         &lt;/a&gt;&#xD;
    &lt;span&gt;
          .
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          What a machine shop should put on the anodizing PO:
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           The specification, type and class.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            Type II or Type III, dyed or clear.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Where contact marks may and may not go.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            A sketch on the print beats a sentence in an email.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Every feature that stays bare.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            Threads, bores, grounding points, mating faces.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           The alloy and temper.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            One per lot, for reasons covered below.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           The coating thickness
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            wherever Type III is called out.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           The parts come back with
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/quality"&gt;
          inspection records you can file against the job
         &lt;/a&gt;&#xD;
    &lt;span&gt;
          , so the PO and the paperwork line up.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Getting the First Immersion Right
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Fixing a bad run costs metal. Every strip and re-anodize removes base metal, so threads that passed after the first coat can fail after the second. Re-anodizing a reworked bore also leaves a new contact mark, sometimes in the bore itself. And touch-up is allowed only for small accidental damage, not as a repair for a run that went wrong.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Which means the first immersion is the one that counts.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A machinist sees most of the problems before the part goes in the tank. A blind pocket that faces up can trap a gas bubble, and the coating won't form where the bubble sits; one shop on a machinist forum lost most of a batch that way. A part that shifts on the rack burns and comes out uneven in thickness and color. At BluArc, pockets that can trap gas are spotted when the job is quoted and racked, not after, and parts are racked tight so they cannot move.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Mixed Alloys Come Back Different
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Anodized color depends on the alloy, the temper and even the mill lot. Two parts of the same design, one cut from 6061 and one from 7075, will not come out of the same tank looking the same. That holds for clear coatings as much as dyed ones.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          So we do not run different alloys in the same load. When a dyed color is called out, it gets checked at lot acceptance, which the current revision of the specification requires. If a job arrives with mixed alloys, we say so before it is racked rather than after it comes back two colors.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Masking and Marking in the Same Visit
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A part that needs a masked bore and a laser-marked part number shouldn't need two vendors after the tank. BluArc masks and laser marks in the same trip, and the parts go back packed so they do not touch each other. A finished part that rattles against its neighbor in a box is a part that can come back scratched through the coating.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          The Straight Answer
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
          Can a good anodizer make rack marks disappear?
         &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          No. Every anodized part touches the rack somewhere, and that spot stays bare. What a good anodizer can do is put the mark where it does no harm, on a surface the drawing does not care about. That only happens when the location is agreed before the run, on the print or the PO.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Questions Machine Shops Ask About Outside Anodizing
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          Can a Bad Anodize Run Be Touched Up?
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Only for small accidental damage. Touch-up is meant for a nick or a scratch, not for a run with burned or uneven coating. A bad run gets stripped and re-anodized, and every strip removes base metal, so tight threads and bores can fail the second time.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          Why Did Two Batches of the Same Part Come Back Different Colors?
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Usually the metal changed. Color varies with alloy, temper and mill lot, so parts cut from different material can come out different even in the same tank. Keeping one alloy and temper per lot, and agreeing on an acceptable range before the run, keeps batches closer together.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Sending the Parts Out So They Come Back Right
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The fix for most outside-anodizing problems is a better hand-off, not a better tank. Put the specification, the contact points and the bare features on the print. Keep alloys apart. Pick a finisher that will read the print before it racks the parts, and that will tell you about a problem before the parts ship.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          How Standard Machine and Manufacturing Can Help
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           Standard Machine and Manufacturing anodizes aluminum parts for other machine shops through BluArc, in the same Greenville, Kentucky facility where we machine our own, with masking and laser marking in the same visit. Start a project with us by
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/start-your-rfq"&gt;
          starting your RFQ
         &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           or
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/contact"&gt;
          reaching out directly
         &lt;/a&gt;&#xD;
    &lt;span&gt;
          . Call us at 270.377.7172.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/b2ffbbb7/dms3rep/multi/thread-gauge-anodized-housing.webp" length="49804" type="image/webp" />
      <pubDate>Mon, 02 Nov 2026 18:00:03 GMT</pubDate>
      <guid>https://www.standardmachine.us/insights/anodizing-for-machine-shops</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/b2ffbbb7/dms3rep/multi/thread-gauge-anodized-housing.webp">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/b2ffbbb7/dms3rep/multi/thread-gauge-anodized-housing.webp">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>How to Choose an Aerospace Machine Shop When Every Quote Looks the Same</title>
      <link>https://www.standardmachine.us/insights/how-to-choose-an-aerospace-machine-shop</link>
      <description>How to choose an aerospace machine shop when quotes are close: what primes score after the PO, who does the finish, and what to ask before ordering.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          How to Choose an Aerospace Machine Shop When the Price Is Close
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          When three quotes for an aluminum part land close together, choose the aerospace machine shop by how it behaves after the purchase order, not by the last few dollars of price. Ask how early it raises questions about the drawing, where it catches problems, how it tells you about one that has already shipped, and who does the finish. Standard Machine and Manufacturing, an ITAR-registered shop in Greenville, Kentucky, machines and anodizes aluminum aerospace parts in one facility and can answer each of those questions plainly.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Close quotes usually mean the shops read the drawing the same way. The material is the same, the cycle times are similar, and the margins land in the same neighborhood. So the price is the smallest real difference between them.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           The bigger differences show up later, on the buyer's own scorecard. Choosing an
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/aerospace"&gt;
          aerospace machine shop
         &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           for aluminum parts is really choosing which supplier's late lot or escaped defect you would rather explain.
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           Certificates belong on the short list, but they rarely break a tie. Two shops with the same paperwork can run a job very differently, which is the same point we made about
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/insights/as9100-vs-iso-9001"&gt;
          what a quality certificate does and does not tell you
         &lt;/a&gt;&#xD;
    &lt;span&gt;
          .
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           Comparing quotes on an aluminum part?
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/start-your-rfq"&gt;
          Start your RFQ
         &lt;/a&gt;&#xD;
    &lt;span&gt;
          .
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What the Scorecard Measures After the Purchase Order
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Large aerospace primes publish how they grade suppliers. Delivery is scored on lots that arrive on time over a rolling year. Quality is scored on nonconformances and on corrective actions that come back late. And a defect costs the supplier more the further downstream it is found: one caught at the supplier's own inspection is a small mark, while one found at the prime's final assembly or in service is a large one.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Primes also expect written notice soon after a supplier knows or even suspects that something nonconforming has shipped, with the part numbers, quantities and ship dates. A shop that waits for the customer to find it has already cost the customer time.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Read that way, the questions worth asking every shop on the list are not about price at all:
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Where do you catch problems?
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            At your own inspection, before the parts are packed, or at the customer's receiving dock.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           What happens the day you find a suspect lot that already shipped?
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            The answer should include a call or a written notice with the lot and the quantity, not a wait-and-see.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           How fast do corrective actions come back?
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            A late response costs the buyer on the prime's scorecard.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Who will I talk to?
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            A buyer chasing an answer through a general inbox is a buyer losing a day.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           Those answers are also what
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/quality"&gt;
          our inspection and documentation
         &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           is built around. When we find a problem on parts that have already shipped, the customer hears it from us first, with the lot and quantity affected. And a problem gets answered with its cause and its fix, not an argument about whose it was.
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A 2022 survey of US custom-part buyers found that most had moved work to a new vendor after a current one failed to deliver, and nearly half said how fast a shop responds affects whether they use it.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Ask Who Does the Finish, and Whether That Can Change
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Anodizing on an aerospace part is a special process. Many shops send it out, and some primes require it to come from their own approved list of processors, a requirement that flows down to the machine shop and beyond.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The part of that a buyer can miss is what happens when the finisher changes. Prime first article requirements can call for a new or partial first article inspection after a change of manufacturing source or process. A route where the outside anodizer can change from one lot to the next carries that risk quietly, and the buyer learns about it when the paperwork shows up. First article reports also commonly fail on special-process certifications that do not trace to the parts.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          At Standard the anodizing runs on our own line, through Standard's anodizing division, BluArc. The route does not change between lots, and the finish certification traces to the part on the same paperwork as the machining.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What Happens to the Date When the Week Goes Wrong
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Any shop can have a week where someone is out sick or a machine is down. The question is whether the job is tied to that one person or that one spindle.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Every machine on our floor runs the same control, and every process is standardized to match. A job can move to another machine, and another operator can pick it up, without starting over. The date does not depend on one person showing up.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Complex, one-off work gets a different kind of attention. Standard was started by a manufacturing engineer whose career was improving and mistake-proofing other companies' processes, and hard jobs get a risk review before they are quoted: what could go wrong, and what will be done about it if it does. The drawing is read for features that will be hard to hold, and for whether dimensions apply before or after the coating, before a price goes back.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          The Straight Answer
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
          Is the lowest of three close quotes the safest choice?
         &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Not by itself. When quotes are close, the price is the smallest difference between them. The difference that shows up later is how each shop catches problems, how fast it tells you about one, and whether its route stays the same from lot to lot. A slightly higher quote from a shop that answers those questions well can be the cheaper part once the scorecard is counted.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Questions Buyers Ask When Comparing Shops
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          Can Changing an Outside Anodizer Trigger a New First Article?
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          It can. Prime first article clauses commonly call for a new or partial first article inspection after a change of manufacturing source or process, and special processes are part of that. The purchase order's quality clauses decide it, so they are worth reading before a supplier's finisher changes.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          Does ITAR Registration Mean a Shop Is Approved for Defense Work?
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          No. US manufacturers of defense articles are required to register with the State Department, and the regulation itself says registration confers no export rights. It is a baseline for defense work, not an approval. Standard Machine and Manufacturing is ITAR registered.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Putting the Questions in the RFQ
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The easiest way to compare shops on behavior is to ask the same questions of each one at the quote, in writing. Where are problems caught, what happens when one ships, how fast do corrective actions come back, who does the finish, and can that change. Shops that answer clearly before the order tend to answer clearly after it.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          How Standard Machine and Manufacturing Can Help
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           Standard Machine and Manufacturing machines aluminum aerospace parts and anodizes them on its own line in Greenville, Kentucky, with standardized processes on every machine and one route from raw plate to finished part. Start a project with us by
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/start-your-rfq"&gt;
          starting your RFQ
         &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           or
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/contact"&gt;
          reaching out directly
         &lt;/a&gt;&#xD;
    &lt;span&gt;
          . Call us at 270.377.7172.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/b2ffbbb7/dms3rep/multi/end-mill-machining-aluminum-bracket.webp" length="43624" type="image/webp" />
      <pubDate>Mon, 26 Oct 2026 17:00:19 GMT</pubDate>
      <guid>https://www.standardmachine.us/insights/how-to-choose-an-aerospace-machine-shop</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/b2ffbbb7/dms3rep/multi/end-mill-machining-aluminum-bracket.webp">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/b2ffbbb7/dms3rep/multi/end-mill-machining-aluminum-bracket.webp">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>When Machining and Anodizing Are Split Between Two Vendors, Who Owns the Bad Part?</title>
      <link>https://www.standardmachine.us/insights/machining-and-anodizing-two-vendors</link>
      <description>Machining and anodizing split between two vendors leaves a part that misses tolerance with two owners. Why it happens and how one shop avoids it.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What Goes Wrong When Machining and Anodizing Are Split Between Two Vendors
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          When machining and anodizing are split between two vendors, the part is measured by two companies at two different stages, and the drawing usually describes only the finished, coated part. So when a coated bore or thread comes back out of tolerance, each shop can show it did its own half correctly, and no one owns the part. Standard Machine and Manufacturing closes that gap by machining and anodizing aluminum parts in one facility in Greenville, Kentucky, so one company answers for the finished part.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          It is one of the most familiar arguments in metal finishing. A part comes back from the anodizer oversized. The machine shop says the coating did it. The anodizer says the coating is on spec and the part must have arrived that way.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           That argument is the real case for buying
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/anodizing"&gt;
          machining and anodizing services
         &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           from one shop. It is less about convenience than about who owns the part when something goes wrong.
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           The
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/machining"&gt;
          CNC machining for aluminum parts
         &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           is the same work either way. What changes is how many companies touch the part before it is finished, and how many of them have to agree on what happened to it.
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           Sending a print with a finish callout?
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/start-your-rfq"&gt;
          Start your RFQ
         &lt;/a&gt;&#xD;
    &lt;span&gt;
          .
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          How the Argument Starts
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           Anodizing does not sit on top of the metal. It grows out of the aluminum, partly into the surface and partly out of it, so a coated part is a little bigger on the outside and a little smaller in its holes than it was bare. We walked through that arithmetic in
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/insights/how-anodizing-changes-part-dimensions"&gt;
          how anodizing changes part dimensions
         &lt;/a&gt;&#xD;
    &lt;span&gt;
          .
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The anodizing specification, MIL-PRF-8625, says anodizing comes after all machining. It also leaves the allowance for that growth to whoever machines the part. So the machinist cuts room for a coating it will never apply, and the anodizer applies a coating to a part it did not cut. The coating has its own tolerance band, too.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Each shop can work inside its own limits and the part can still miss. When it does, here is what each side can say, truthfully:
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           The machine shop:
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            the part measured in tolerance when it left.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           The anodizer:
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            the coating thickness came in on spec.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           The buyer:
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            the part does not fit.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          All three can be true at once. That is what makes it an argument instead of a fix.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           The paperwork splits the same way. The machining records come from one company and the finish certification from another, each describing the part at a different stage, and the buyer is left to line them up. One company doing both means one set of
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/quality"&gt;
          inspection records for the finished part
         &lt;/a&gt;&#xD;
    &lt;span&gt;
          .
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Why It Is Hard to Settle After the Fact
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Once a part is coated, its bare size cannot simply be measured again. Part of the original surface has turned into coating. So the one measurement that would settle the question, the size of the feature just before it went in the tank, either was taken at the other company or was not taken at all.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Then the replacement starts. New material, the part machined again, another trip to the anodizer, another wait in its queue. And somewhere in that loop is a second conversation about who pays for the scrap.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Dimensions are the common fight, not the only one. A split job has a few other seams where problems tend to collect:
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Contact marks.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            Every anodized part touches a rack somewhere, and that spot stays bare. The specification allows it, but where the mark lands has to be agreed before the run. A bare spot on the wrong face can turn a good part into a reject.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Masking.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            A feature that has to stay bare only stays bare if the anodizer knows about it. That depends on what made it from the drawing onto the finishing purchase order.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Handling.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            Freshly machined parts ride in a truck, uncoated, between the two shops.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Flow-down.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            On defense and aerospace work, the prime's requirements have to be passed down again to the outside finisher, on every order.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          None of these is exotic. Each one is a hand-off, and each hand-off is a place where one company assumed the other had it covered.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What Changes When One Company Owns Both Halves
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The work does not change. The ownership does.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          At Standard, the parts are machined on our floor and anodized on our own line, through Standard's anodizing division, BluArc. That moves each of the seams above inside one company:
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           The allowance and the coating are decided by the same shop,
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            before the part is programmed, so the growth is planned for rather than discovered.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Contact points and masked features are picked while the part is still a drawing,
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            by the people who will rack it.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           The part stays in one facility
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            from raw plate to finished surface.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           There is one supplier to qualify,
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            and one company for a prime's requirements to flow down to.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           If a coated feature misses, there is one call to make,
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            to the company that did both halves, and the fix starts on the floor rather than in an exchange of emails.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          That last one matters most. A buyer with one supplier never has to work out which supplier caused the problem.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          The Straight Answer
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
          Does buying both from one shop mean a part never comes back wrong?
         &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          No. Parts can still be rejected, and a coated feature can still miss. What changes is that the reject belongs to one company, the one that did both the machining and the finish, and the question of whose fault it is does not come up. The only question left is how fast the part gets fixed.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Questions Buyers Ask About Splitting the Work
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          Who Is Responsible for Growth From Anodizing?
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The machinist. MIL-PRF-8625 has anodizing follow all machining and leaves the allowance for coating growth to whoever machines the part. When one company does both, the allowance and the coating that fills it are the same company's responsibility.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          Should All Machining Be Finished Before Anodizing?
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Yes. The specification calls for anodizing after machining, heat treatment, welding and forming. Machining a coated surface cuts through the coating, so the machining is finished first and the part goes in the tank once.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Keeping a Split Job From Turning Into an Argument
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          When a job has to stay with two shops, the fix is to settle the questions before the first cut instead of after the first reject. That means the full finish callout on the print (the specification, the type, the class, the thickness on Type III, and any features that stay bare), and both shops agreeing on the allowance and the contact points before anything is machined.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          When the job can move, the simpler fix is one quote for the machining and the finish together, from a shop that does both.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          How Standard Machine and Manufacturing Can Help
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           Standard Machine and Manufacturing machines aluminum parts and anodizes them on its own line, in one facility in Greenville, Kentucky, and quotes the part as one job from raw plate to finished surface. Start a project with us by
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/start-your-rfq"&gt;
          starting your RFQ
         &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           or
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/contact"&gt;
          reaching out directly
         &lt;/a&gt;&#xD;
    &lt;span&gt;
          . Call us at 270.377.7172.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/b2ffbbb7/dms3rep/multi/machined-housings-in-shipping-crate.webp" length="85716" type="image/webp" />
      <pubDate>Mon, 19 Oct 2026 17:00:23 GMT</pubDate>
      <guid>https://www.standardmachine.us/insights/machining-and-anodizing-two-vendors</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/b2ffbbb7/dms3rep/multi/machined-housings-in-shipping-crate.webp">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/b2ffbbb7/dms3rep/multi/machined-housings-in-shipping-crate.webp">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Need a Machine Shop That Also Anodizes? What One Roof Does for Your Part</title>
      <link>https://www.standardmachine.us/insights/machine-shop-that-also-anodizes</link>
      <description>A machine shop that also anodizes plans the coating before the first cut and keeps the part in one facility. What one roof changes for aluminum parts.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What a Machine Shop That Also Anodizes Changes for the Part
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Hire a machine shop that also anodizes, and the finish stops being a separate job. The coating is planned while the part is still a drawing. The part stays in one facility from raw plate to finished surface. And one company answers for how it turns out.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Standard Machine and Manufacturing machines and anodizes aluminum parts under one roof in Greenville, Kentucky. CNC machining and MIL-A-8625 anodizing, Type II and Type III, run in the same facility through Standard's anodizing division, BluArc, so a part machined at Standard leaves the shop finished.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           A buyer looking for a
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/anodizing"&gt;
          machine shop with in-house anodizing
         &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           is usually trying to remove a step. The second vendor, the second quote, and the truck that runs between them.
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           Nothing about
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/machining"&gt;
          CNC machining aluminum parts
         &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           changes because the anodizing line sits across the floor. What changes is everything that happens after the last tool comes out of the spindle.
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           Have an aluminum part that needs both?
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/start-your-rfq"&gt;
          Start your RFQ
         &lt;/a&gt;&#xD;
    &lt;span&gt;
          .
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          The Finish Gets Planned Before the First Cut
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Anodizing is not paint sitting on top of the metal. It grows out of the aluminum itself, part of it into the surface and part of it out, and the published rule is that each coated surface grows by about half the coating thickness. On a flat face nobody notices. On a tight bore or a thread, that growth is the difference between a part that passes and one that does not.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           The anodizing specification, MIL-PRF-8625, says anodizing comes after all machining is done. It also puts the allowance for coating growth on the machinist. So the decision that decides whether a coated feature lands in tolerance gets made at the machine, before the part ever reaches a tank. We walked through the arithmetic in
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/insights/how-anodizing-changes-part-dimensions"&gt;
          how anodizing changes part dimensions
         &lt;/a&gt;&#xD;
    &lt;span&gt;
          , including what happens to holes and threads.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          When the machinist and the anodizer work for different companies, that allowance is one shop's estimate of another shop's process. When they work in the same facility, it is a short walk.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Rack marks are the small version of the same thing. An anodized part has to carry current, so it touches a rack somewhere, and wherever it touches, no coating forms. The specification allows those contact marks. Where they land is negotiable, though, and the only time to negotiate it is before the run. Between two companies that tends to be a round of emails after the parts are already cut. Under one roof the contact points can be picked while the part is still being programmed, somewhere a bare spot does no harm.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           There is a paperwork side too. The inspection records for the machining and for the finish come from one company, which is simpler to review than two sets from two suppliers. It is also one fewer supplier for a buyer to qualify, and one fewer sub-tier for a prime's requirements to flow down to. That is part of
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/quality"&gt;
          how we inspect and document finished parts
         &lt;/a&gt;&#xD;
    &lt;span&gt;
          .
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          One Facility, One Schedule, One Company Answering for It
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Here is what drops out of the job when both operations live under one roof:
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           The second purchase order.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            One RFQ covers the machining and the finish, and one quote comes back.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           The freight in the middle.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            Machined parts are not packed, shipped and unpacked between operations, and freshly machined surfaces do not ride in a truck before the coating is there to protect them.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           The second calendar.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            The machining and the anodizing sit on one schedule, kept by one company, instead of two schedules kept by two.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           The round trip on a reject.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            At an outside finisher, a color or rack-mark rejection restarts the loop: pack, ship, wait in line, inspect. Here the part walks back across the floor.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           The question of whose problem it is.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            If a coated feature comes back wrong, there is one call to make, and the company on the other end did both halves.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          That last one matters more than it looks on a quote. A split job has a seam in it, and problems collect at seams.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          It also runs the other way. Some of BluArc's anodizing customers found the anodizing first, learned the same facility machines parts, and sent the next job as a drawing instead of a box of parts to coat.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          The Tanks Were Sized to the Machine
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Standard's largest cutting envelope is 120 inches. When the anodizing line went in, the tanks were sized to the same 120 inches.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          That was on purpose. If we can machine it, we can anodize it. No part gets cut here that then has to leave the facility to find a tank big enough to finish it.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          It matters most on the parts that are hardest to place anyway. A long part is the one with the fewest finishers able to take it, and the one that is the most work to crate, ship and uncrate between two vendors.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          The Straight Answer
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
          Does one roof mean you can anodize anything you machine?
         &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          No, not anything. Anodizing is an aluminum process, which is a large part of why Standard machines aluminum and nothing else. A steel or stainless part needs a different shop and a different finish, and we would say so at the quote rather than after.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Within aluminum, the limit is size. There is always a shop somewhere with a bigger tank. Ours matches the largest part we cut, so the question rarely comes up.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Questions Buyers Ask About Machining and Anodizing Together
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          Can You Anodize Parts Another Shop Machined?
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Yes. BluArc anodizes parts for other machine shops, and that outside work is now a large share of what runs through its tanks. The same specification applies whether the part was cut here or somewhere else.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          What Anodize Colors Are Available?
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Black, clear, red, green and blue are standard. Clear means undyed rather than colorless, so a clear hard coat comes out gray or gold-toned depending on the alloy. Other colors are possible on a large enough run of parts.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          Can Features Be Kept Bare, or Parts Marked?
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Yes. Masking keeps the coating off a bore, a thread or a mating surface, and laser marking puts a part number or logo into the finish once it is done. Both happen in the same facility.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Scoping a Part That Needs Both
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The specification's own ordering section lists what a buyer has to state for an anodized finish, and the cleanest quotes start from a print that already carries it. So send the print with the finish callout complete:
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
           The specification, MIL-A-8625 or MIL-PRF-8625
          &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
           The type, Type II or Type III hard coat
          &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
           The class, Class 1 (undyed, sold as clear) or Class 2 (dyed), with the color
          &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
           The coating thickness, if the part is Type III
          &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
           Any features that have to stay bare, and any marking
          &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          With that on the drawing, the allowance gets built into the machining from the first operation instead of being worked out after a part has already come back wrong.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          How Standard Machine and Manufacturing Can Help
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           Standard Machine and Manufacturing machines aluminum parts and finishes them on its own anodizing line, in one facility in Greenville, Kentucky, and quotes the part as one job from raw plate to finished surface. Start a project with us by
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/start-your-rfq"&gt;
          starting your RFQ
         &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           or
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/contact"&gt;
          reaching out directly
         &lt;/a&gt;&#xD;
    &lt;span&gt;
          . Call us at 270.377.7172.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/b2ffbbb7/dms3rep/multi/brackets-on-anodizing-rack.webp" length="50770" type="image/webp" />
      <pubDate>Mon, 12 Oct 2026 17:00:11 GMT</pubDate>
      <guid>https://www.standardmachine.us/insights/machine-shop-that-also-anodizes</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/b2ffbbb7/dms3rep/multi/brackets-on-anodizing-rack.webp">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/b2ffbbb7/dms3rep/multi/brackets-on-anodizing-rack.webp">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>Why Aluminum Parts Move After Machining, and How to Stop It</title>
      <link>https://www.standardmachine.us/insights/why-aluminum-parts-move-after-machining</link>
      <description>Aluminum plate carries residual stress from quenching and rolling. Machining unbalances it and the part moves. What the 51 in T651 buys, and why datums matter.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Why did my part move after machining?
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Because it was holding stress, and machining let it go. Aluminum plate arrives with a residual stress field already inside it, roughly balanced through the thickness. Cutting a pocket into it takes away part of what was holding the rest in equilibrium, so the material that is left finds a new one. It bows, it twists, or it springs the moment the clamps come off.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The part is not warping. It is relaxing. That is not a word game, because the two point at different culprits. Warping suggests something went wrong at the machine. Relaxing says the stress was in the plate before anyone touched it, and the job was to plan around it.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Which is why this is fixable, and why most of the fix happens before the first chip.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Two things put the stress there, and neither one is machining
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The first is the quench. After solution heat treatment the plate is cooled fast, and the surface cools and contracts before the core does. The surface ends up in compression and the core in tension. The second is rolling, which works the metal and leaves its own stress behind.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          What comes off the end of that process is a plate whose internal stresses are large, roughly symmetric through the thickness, and balanced. Balanced is the word that matters. The forces are real and they cancel, so the plate sits flat and gives no sign of what is in it.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Then somebody machines it, and the cancelling stops.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          Why it bites aerospace hardest
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Aerospace structural parts are the worst case in every direction at once. Thick plate hogged out to thin walls and deep pockets. Often eighty to ninety-five percent of the material removed. Frequently cut from one side. Often long and slender. That combination is maximum stress redistribution against minimum remaining stiffness, which is why a shop can machine an aerospace bracket correctly and still watch it lift off the surface plate.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          It shows up in commercial work too, on any part where a lot of material comes out of a thick section. Aerospace just gets there first, and gets there worst.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          The control that buys the most happens before the first chip
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Specify a stress-relieved temper. The plate is stretched after heat treatment, which takes most of the quench stress out of it before anyone cuts anything, and it costs a line on a purchase order rather than an operation in a shop. It is the single most effective control available on this problem and it is the customer's to set, not the shop's.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          What the suffix is telling you
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           The trailing 51.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            Stress relieved by stretching. T651, T7351, T7451 and T451 all carry it.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           The trailing 52.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            Stress relieved by compressing. Same intent, different method.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           T6 on its own.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            Solution heat treated and artificially aged, with no stress relief step at all. Same alloy, same strength, a plate that behaves differently under a roughing cut.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           T73 and T7.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            Overaged and stabilized, trading some strength for stress corrosion cracking resistance. Paired with the 51 on the tempers that matter for thick plate.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          Where the choice actually lands
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           7075-T651 rather than 7075-T6.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            On a pocketed structural part, the temper line on the purchase order is doing more for the outcome than anything in the CNC program.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           7050-T7451 in heavy sections.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            Less quench sensitive than most aerospace alloys, so it keeps its strength through thick plate, with better toughness and stress corrosion cracking resistance than 7075. Particularly strong in the three to six inch range, and the plate that signals real aerospace structure.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Substituting temper is not a small favor.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            On an aerospace program, converting heat treat condition counts as material substitution. A shop that quietly runs the T6 it had on the rack instead of the T651 the drawing called for has changed the part, whatever the finished dimensions say.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Stress-relieved plate is a better start, not a finished answer
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Stretching addresses the quench stress. Rolling stress is still in there, and machining puts fresh stress into every surface it makes, and a thin wall has very little stiffness left to resist either one. So the rest of the control lives in how the part gets cut and how it gets held.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          Rough, let it rest, then finish
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Rough to a stock allowance and stop. The part moves at that point, which is the entire idea, because it moves while there is still material left to correct it with. Some shops rest it overnight. Some flip it and re-datum. Then the finish pass cuts to the print on a part that has already done most of its moving. It costs a setup and it saves a part.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          Take material off both faces where the design allows
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Machining one face of a plate is the reliable way to make a banana. Removing material evenly from both sides keeps the stress field closer to balanced while the bulk of it comes off, and where the design permits it, that costs nothing at all.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          Hold the part without preloading it
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Clamp a plate flat, machine it in that condition, then release it, and it goes where it always wanted to go. Vacuum fixtures spread the load instead of pinching it. Soft jaws, sacrificial tabs and low melt fixture wax hold thin parts without point loads. Leaving tabs and webs in until the last operation keeps stiffness in the part while the material is coming out. Common practice on a part like this is to back the clamping force off before the finish passes and re-indicate.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          Light finish passes
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Machining adds stress to the surface it just cut. A heavy finish pass on a thin wall lays a stressed layer onto a part with nothing left to resist it, so finishing here is light and patient rather than fast. Fast was the roughing operation, and that already happened.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          A datum on a face that moves is a first article failure with the date already on it
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Here is where this stops being a shop problem.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          If a print takes its datum from a large thin face, and that face is going to relax, then everything measured from it inherits the movement. The part can be cut correctly, to the program, by a shop doing everything above right, and still fail inspection, because the reference itself moved. Nothing downstream recovers from that.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The fix is usually small. A different face. A different feature. Sometimes a datum target rather than a whole surface. Small, and close to free, as long as it happens before the drawing is released and the job is quoted. The same change after a failed first article is a program revision, new paperwork, a delay, and a conversation nobody wants to have twice.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          So the useful version of all this is not the metallurgy. It is that two decisions govern whether the part comes out flat, the temper on the purchase order and the datum scheme on the drawing, and both of them are made by the buyer before a shop has quoted anything. Both are worth five minutes with the shop that is going to cut the part. We would rather raise it at the RFQ than explain a bowed part later, and a shop that never raises it is not doing you a kindness.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
          Will you commit to flatness on a thin walled part hogged out of thick plate?
         &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Not from the print alone, and not before we know the temper. Plate that has never been stress relieved is going to move, and a tolerance written against a datum on a face that moves is a number nobody can hold, however carefully the part is cut.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Tell us the temper and the datum scheme and it usually becomes a straightforward yes. If the plate has to be T6 and the datum has to stay where it is, then the honest answer is that a first article decides it rather than a quote. We would rather say that at RFQ than at inspection.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Questions buyers ask about aluminum that moves
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          What is the difference between 6061-T6 and 6061-T651?
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          T651 is the same heat treatment with a stress relief step added, the plate being stretched after solution heat treatment and aging. Mechanically the two are close enough that a strength calculation rarely cares which one it has. On a part that gives up most of its material to the chip bin, they behave differently, and the one that behaves is the one carrying the 51.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          If I specify a stress relieved temper, is the problem solved?
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          No, but it is reduced, and often that is enough. Stretching addresses the quench stress and leaves rolling stress and machining-induced surface stress in play, which is why the sequencing and workholding controls still apply on a thin walled part.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          Does this only happen with 7075, or does 6061 move too?
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Both move, because the mechanism belongs to the plate rather than to the alloy. 7075 collects the reputation because it turns up in thick plate hogged out to structure, which is the condition with the most stress to redistribute and the least material left to resist it.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          Is there an aluminum that stays flat after machining?
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Cast tooling plate, when flatness matters more than strength. MIC-6 and its equivalents are cast rather than rolled and supplied fully stress relieved, so they are sold on dimensional stability and they hold it after machining. Fixture plates, jigs and tool bases, not structural parts.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Send the print before the plate is ordered
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          If you have a part coming out of thick plate with pockets in it, the temper line and the datum scheme are worth settling now rather than after a first article. Send the drawing and tell us which surfaces have to stay where they are. We will tell you what is likely to move, and what to change so it does not.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           Start a project with us by
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/start-your-rfq"&gt;
          starting your RFQ
         &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           or
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/contact"&gt;
          reaching out directly
         &lt;/a&gt;&#xD;
    &lt;span&gt;
          . Or call 270.377.7172.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/b2ffbbb7/dms3rep/multi/why-aluminum-parts-move.jpg" length="65933" type="image/jpeg" />
      <pubDate>Mon, 05 Oct 2026 13:49:30 GMT</pubDate>
      <guid>https://www.standardmachine.us/insights/why-aluminum-parts-move-after-machining</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/b2ffbbb7/dms3rep/multi/why-aluminum-parts-move.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/b2ffbbb7/dms3rep/multi/why-aluminum-parts-move.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>How Anodizing Changes the Dimensions of a Machined Aluminum Part</title>
      <link>https://www.standardmachine.us/insights/how-anodizing-changes-part-dimensions</link>
      <description>Anodizing grows into and out of the metal. What MIL-PRF-8625F says the growth is, what it does to a bore, a thread and a sharp edge, and what the trade sees.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Why does a part come back from anodize too big?
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Because it is bigger. Anodizing converts the surface of the aluminum into aluminum oxide, and the oxide occupies more room than the metal it replaced. MIL-PRF-8625F w/Amd 2 states the rule in section 6.10.1: an increase in dimension equal to one half of the thickness of the applied coating can be expected for each surface coated.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The specification works its own example. A 0.004 inch coating calls for 0.002 inch of pre-machining allowance per surface on a close-tolerance part.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Read that again and notice where it lands. That is a machining instruction, written into a finishing specification. The part measured perfectly on the surface plate because it was measured before the coating existed, and the allowance that would have kept it in tolerance had to go into the program weeks earlier.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="https://claude.ai/anodizing" target="_blank"&gt;
          What the anodizing line runs to, and what it does to the metal
         &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Three features where it stops being a rounding error
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          On an open face, half a coating thickness is usually nothing. The trouble starts where two coated surfaces face each other, and where a coating has to build on a corner instead of a plane.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          A bore closes by twice the growth
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Both walls grow inward. Whatever the per-surface growth is, the diameter loses two of them. A bore that came off the machine on the low side of its tolerance is the first feature to fail a gauge pin after the tank, and it fails without anything having gone wrong in either building.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          A thread moves by about four times it
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          On a 60 degree thread the geometry multiplies. Pitch diameter changes by roughly four times the per-surface growth while major and minor diameters change by twice it, so a thread can measure acceptably across the majors and still bind halfway down. That is the complaint that usually arrives blaming the tap.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Tapping order is the other half of that question. A hole cut to nominal before the tank comes back tighter than it went in, so the two usual answers are an oversize tap or a plug that keeps the coating out of the hole altogether. Blind holes earn a separate thought. They hold process solution after the part leaves the rack, and what does not rinse out has a way of reappearing on the finish days later. Neither problem is hard. Both are cheaper to settle in the program than at the bench.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          A sharp edge will not carry hard coat
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Type III does not build on an unbroken corner the way it builds on a face, and the specification treats that as a design requirement rather than an anodizer's problem. Table III asks for roughly a 1/16 inch radius at a 0.002 inch coating and roughly 1/8 inch at 0.004 inch. A print that calls hard coat and leaves the edges sharp is asking for two things that do not fit together.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="https://claude.ai/machining" target="_blank"&gt;
          Who owns the pre-machining allowance, and why it is a machining decision
         &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What the specification gives you, by type
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Two things to read off it. The growth ratios do not change between the types, so the arithmetic in both columns is identical and only the thickness moves. And the thickness moves a long way. Type III at its nominal is twice the thickest Type II coating the specification allows, which is why a tolerance that survives Type II without anyone mentioning it can be gone on hard coat.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
          The ratios, identical on both types:
         &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Growth per coated surface.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            Half the coating thickness.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           On a bore diameter.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            Twice the per-surface growth.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           On a 60 degree thread pitch diameter.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            About four times the per-surface growth.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
          What actually changes between them:
         &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Coating thickness.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            Type II runs 0.00007 to 0.0010 inch. Type III runs 0.0005 to 0.0045 inch, with 0.002 inch nominal unless the print says otherwise.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Thickness tolerance.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            Type II is controlled by coating weight, at a minimum of 1000 mg/ft². Type III is held to ±20% up to 0.002 inch and ±0.0004 inch above it.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Minimum edge radius.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            Not specified for Type II. For Type III, about 1/16 inch at a 0.002 inch coating and about 1/8 inch at 0.004 inch.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           What working anodizers report.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            Type II build often measures lighter than the half-in rule predicts. Type III behaves close to it.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           Already have a print with an anodize callout on it?
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="https://claude.ai/start-your-rfq" target="_blank"&gt;
          Start Your RFQ
         &lt;/a&gt;&#xD;
    &lt;span&gt;
          .
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          The authorities do not agree, and it matters on a tight number
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The specification states a flat rule. Half the coating goes into the metal and half of it stands proud, on every type, on every surface.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The Aluminum Anodizers Council and a good number of working anodizers put Type II closer to two thirds in and one third out, with only Type III behaving the way the document describes. Both positions are published. Both cannot be right.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The gap is small in absolute terms and it is irrelevant on a part with an ordinary tolerance. On a bore held to a few ten-thousandths it is the whole tolerance band.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          So here is the position Standard works to, plainly. We calculate to the specification, because the specification is the number a print and a purchase order can be held to, and a shop that quietly plans to a different rule than the one the drawing invokes is storing up an argument for later. Then, on tight-tolerance Type II, we stop trusting the calculation. Measured build on Type II runs lighter than the rule predicts often enough that the number governing production should come off a first article rather than off a spreadsheet.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Calculate to the document. Prove it on a part. Type III is the easier case, because it behaves close to what the specification says it will.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Anodize goes last, so the allowance gets decided first
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Section 3.3.1.1 requires anodizing after heat treatment, machining, welding, forming and perforating are finished. There is no operation after it where a dimension gets corrected. Whatever the part measures going into the rack, plus the growth, is what ships.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Which makes the allowance a machining decision with a finishing input, and it has to be made before the program is written.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The rack is the same kind of decision arriving in different clothes. Anodizing is an electrical process, so every part needs at least one point where the rack holds it, and that point does not coat. Section 3.12.1 asks for contact marks held to a minimum consistent with good practice, which is not the same thing as none. Where they land is negotiable, and a location is far easier to agree on a drawing than on a finished part.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          None of this is difficult. It is just early. When the mill and the tank sit in the same facility, the allowance, the rack point and the masking all get settled in one conversation, before anything is cut, by people reading the same print. That conversation takes about five minutes.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
          Will you commit to a tight tolerance on a feature that has to survive anodize?
         &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Not on the strength of a calculation, and on Type II that is the honest answer. The specification's growth rule is the baseline and it is what we plan to, but measured Type II build often runs lighter than it, so a tight post-anodize number gets proved on a first article before it governs production.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          If the schedule has no room for a first article, then the tolerance opens or the feature gets masked. There is no third door. We would rather say that at quote than have it turn up at inspection.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Send this with the print
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
           The anodize callout in full. Type, class, and on Type III the thickness. The specification's own ordering data section asks the purchaser for exactly that, and a note reading only anodize leaves the choice to somebody who has not seen the assembly.
          &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
           Which features have to hold after the tank. Bores, threads, sealing faces, anything that mates. Knowing which numbers have to survive puts the allowance in the program instead of in a rework.
          &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
           Alloy and temper. Both color and build move with alloy chemistry, so this is not a formality.
          &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;span&gt;
           Where the rack may touch, or a line saying we should choose. Either answer works. Silence is the one that gets decided without you.
          &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="https://claude.ai/start-your-rfq" target="_blank"&gt;
          Send a print and we will come back with the allowance already in it
         &lt;/a&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Questions buyers ask before they send a print
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          How much does anodizing change the size of my part?
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          About half the coating thickness on each coated surface, which is what MIL-PRF-8625F states. Type II coatings run from 0.00007 to 0.0010 inch and Type III from 0.0005 to 0.0045 inch with a 0.002 inch nominal, so the growth is small in absolute terms and large next to a tight tolerance.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          Do I need oversize taps for hard coat tapped holes?
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          That is one of the two usual answers, the other being to mask or plug the hole. Pitch diameter moves about four times the per-surface growth, so a hole tapped to nominal ahead of a 0.002 inch hard coat can come back too tight for its fastener. Tell us the tapped holes are going in the tank and the decision happens at the program rather than at the bench.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          My print calls out MIL-A-8625F. Is that still the right specification?
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          It is the legacy designation, and it is still on a great many drawings in circulation. The active document is MIL-PRF-8625F with Amendment 2, dated 23 November 2020, and the types and classes did not change when the prefix did. A drawing calling the old number gets processed to the current specification unless the customer says otherwise in writing.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          Can a feature be masked so it does not grow at all?
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Yes, and masking is one of the finishing services Standard runs in house. Decide it early. A masked feature is a fixture and a labor operation rather than a note on a drawing, and it is cheaper to plan than to add.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Bring us the part before it is cut
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          If you have an aluminum part headed for a finish, the allowance is worth an hour now rather than a first article later. Send the print and the anodize callout and we will tell you what moves and by how much.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;br/&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;a href="https://claude.ai/start-your-rfq" target="_blank"&gt;
          Start Your RFQ
         &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           or
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="https://claude.ai/contact" target="_blank"&gt;
          Contact Us
         &lt;/a&gt;&#xD;
    &lt;span&gt;
          . Or call 270.820.7009.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/b2ffbbb7/dms3rep/multi/post-dimension-anodizing-featured.jpg" length="64615" type="image/jpeg" />
      <pubDate>Mon, 28 Sep 2026 13:50:00 GMT</pubDate>
      <guid>https://www.standardmachine.us/insights/how-anodizing-changes-part-dimensions</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/b2ffbbb7/dms3rep/multi/post-dimension-anodizing-featured.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/b2ffbbb7/dms3rep/multi/post-dimension-anodizing-featured.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
    <item>
      <title>AS9100 vs. ISO 9001: What the Aerospace Standard Actually Adds</title>
      <link>https://www.standardmachine.us/insights/as9100-vs-iso-9001</link>
      <description>AS9100D contains ISO 9001:2015 in full and adds an aerospace layer on top. What that layer covers, how to verify a certificate in IAQG OASIS, and what it omits.</description>
      <content:encoded>&lt;div data-rss-type="text"&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What is the difference between AS9100 and ISO 9001?
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          AS9100 contains ISO 9001 in full and then adds a layer of aerospace requirements on top of it. That is the whole relationship. A shop certified to AS9100D is meeting every clause of ISO 9001:2015 as part of it, plus a set of additional requirements that exist because the general standard was not enough for aerospace.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          So the two are not alternatives, and a buyer comparing them is not choosing between two competing systems. One document is larger, and it contains the smaller one.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Which makes an ISO 9001 certificate a real quality credential that is not an aerospace credential. It says a company controls its processes, keeps records, corrects problems, and gets audited on all three. It says nothing about product safety, counterfeit parts, configuration control or flight risk, because ISO 9001 does not ask about them.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Why the aerospace layer exists at all
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          SAE issued the first AS9100 in March 1999. It added fifty-five aerospace-specific requirements to the ISO 9001 of the day, and the reason it was written is the part worth keeping: ISO 9001 on its own did not satisfy Boeing, Lockheed Martin, NASA and the FAA. Rather than four organizations maintaining four separate supplier standards, the industry built one.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The current certifiable revision is AS9100D, published in 2016 and built on ISO 9001:2015. Four revisions in, the pattern has held. When the underlying ISO standard moves, the aerospace document moves with it.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          It is moving again. The AS9100 series is being renamed and revised as IA9100, expected in 2026 or 2027 with a transition window running to roughly 2029 under IAQG guidance. None of that changes what a buyer should do this year. Certificates are issued against AS9100D today, and a quality system built to AS9100D is the system that transitions.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What is shared, and what the aerospace layer adds
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The clean way to read the two documents side by side is to separate what AS9100 inherits without change from what it puts on top. Nearly everything a quality manager would recognize as a quality system comes from ISO 9001. The additions are narrow, and they are all about what happens when a part ends up in an aircraft.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          Inherited from ISO 9001:2015, unchanged
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Context and leadership.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            The same clauses, the same requirements for management commitment and a quality policy.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Risk-based thinking.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            ISO 9001's own risk framework, kept intact.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Process control and documented information.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            Procedures, work instructions, records, and the requirement to keep all of it current.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Internal audit and management review.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            The same cycle, on the same terms.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Nonconformity and corrective action.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            The same closed loop.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          Added by the aerospace layer
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;ul&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Product safety.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            Dedicated requirements across several clauses. ISO 9001 has no equivalent.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Counterfeit part prevention.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            Its own clause, aimed at material and components entering the supply chain.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Human factors.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            Folded into nonconformity and corrective action, so a root cause has to account for the person and not only the process.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Configuration management.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            Significantly expanded. This is what keeps a part number, a revision and a drawing in agreement across the life of a program.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Risk management.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            Aerospace operational risk merged with ISO's risk-based thinking rather than bolted beside it.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
    &lt;li&gt;&#xD;
      &lt;strong&gt;
           Project management, design and development controls, external provider management, and post-delivery support.
          &lt;/strong&gt;&#xD;
      &lt;span&gt;&#xD;
        &lt;span&gt;
            Each one expanded, with flow-down of requirements to sub-tier suppliers written into supplier management.
           &lt;/span&gt;&#xD;
      &lt;/span&gt;&#xD;
    &lt;/li&gt;&#xD;
  &lt;/ul&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Check the certificate in OASIS, not on the website
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A logo on a supplier's site is not verification, and neither is a PDF of a certificate. A PDF is a static file. It reflects the day it was made and nothing after that.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The record of authority is OASIS, the Online Aerospace Supplier Information System, run by the International Aerospace Quality Group. It holds supplier and audit assessment data for companies holding accredited certification in the AQMS series of standards, which is AS9100, AS9110 and AS9120. Anyone can register for access, so this is a check a sourcing engineer can run without asking the supplier for anything first.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The rule practitioners state is blunt. If an organization's certificate is not listed in OASIS, the IAQG does not recognize it. Accreditation is the thing being verified, and it is not something a printed certificate can demonstrate about itself.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          Then read the scope, which is the step that gets skipped
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          A certificate covers a defined scope of work at a defined site. It is entirely possible for one to be genuine, current, properly accredited, listed in OASIS, and still not cover the work being bought. A scope written around assembly does not cover machining. A scope written around one facility does not cover a second building down the road.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          So read the scope statement against the part. That comparison takes about a minute, and it is the difference between verifying a supplier and verifying a logo.
         &lt;/span&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           ﻿
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          What certification does not tell you
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          This is the part that often gets left out. AS9100D certification is a gate condition, not a differentiator. Boeing, Lockheed Martin, Airbus and their tier-one partners typically require it before a supplier can be approved at all, which means that by the time a buyer is comparing two certified shops, both of them cleared the same bar in the same way.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          The certificate says a quality system exists, is documented, and has been audited by an accredited body against the aerospace standard. It does not say the shop has machined a part like yours, holds the tolerance the print calls for, has capacity for the quantity, or picks up the phone when something goes sideways on a Friday afternoon.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          AS9100 says as much itself. Clause 8.4 requires the buying organization to determine the type and extent of controls on external providers based on the potential impact on its ability to meet customer requirements. In plain terms, the aerospace standard tells its own certified users to go and evaluate their suppliers anyway. That is why supplier questionnaires, capability audits and first article inspections sit alongside the certificate rather than instead of it.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Point is, the certificate answers one question completely and it was never built to answer the others.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          The path the primes wrote for a supplier in the middle
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Certification is a two-stage audit by an accredited certification body, and there are prerequisites before either stage runs. The system has to be fully implemented and used long enough to generate records. A complete cycle of internal audits has to be finished. A management review has to be completed. Stage 1 examines the documentation. Stage 2, usually one to two months later, examines whether the documentation describes what actually happens on the floor.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Which means a shop can sit at a precise, nameable point rather than somewhere vague: documentation complete, internal audit cycle complete, management review complete, waiting on the external audit. That is a different statement from working toward certification, and the primes' own supplier documents treat it differently too.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Lockheed Martin's Appendix QJ opens section 1.0 by requiring a third party certified AS/EN9100 quality management system, "except as defined below." What follows is the exception. Sellers not holding that accreditation "will have their QMS validated using the checklist that supports Appendix A Quality Management System Requirements Checklist."
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          GKN Aerospace's quality requirements are built the same way. A supplier has to maintain a quality assurance system meeting the latest revision of SAE AS9100. Registration by an independent registrar "is not required," though "future registration will be required to maintain the status of active supplier," and in the interim "non-registered suppliers are subject to internal process audits to determine compliance to the latest revision of SAE AS9100."
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Not every buyer offers that route. Some will not add a supplier to an approved list without a certificate in hand, and that is a legitimate position for a program to take. But the route exists in real documents from real primes, and a quality manual that contains a validation checklist gives its buyer more room than the certificate list alone suggests.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Standard's quality management system is built to AS9100D and ISO 9001:2015. The documentation is complete, a full internal audit cycle and management review are behind us, and the certification audit is pending. We would rather write that sentence plainly than round it up. If your supplier quality manual has a validation route for a shop in exactly that position, send us the checklist.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;strong&gt;
          Does an AS9100 certificate tell you a shop can make your part?
         &lt;/strong&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          No. It tells you a quality system exists, is documented, and has been audited by an accredited body against the aerospace standard. It does not tell you the shop has run a part like yours, holds the tolerance on your print, or has the capacity for the quantity you need.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          That is not an argument against the certificate. It is the reason the certificate is the start of a supplier evaluation and not the end of one. Verify it in OASIS, read the scope against the work, then ask the questions it was never built to answer.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Questions buyers ask about the two standards
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          Is AS9100 better than ISO 9001?
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          It is larger, not better. AS9100D contains ISO 9001:2015 in full and adds aerospace requirements on top of it, so the comparison is not between two competing systems. For a part that is not going into an aircraft, ISO 9001 certification may be exactly the right credential for the job.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          Do I need a supplier to hold both AS9100 and ISO 9001?
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          No, because AS9100 already contains ISO 9001. Some suppliers carry both certificates for commercial reasons and some hold ISO 9001 alone because their work is not aerospace, but a current AS9100D certificate covers the ISO 9001:2015 requirements inside it.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          How do I verify that an AS9100 certificate is real?
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          Search the supplier in the IAQG OASIS database rather than accepting a PDF or a logo. OASIS holds accredited certification data for the AS9100, AS9110 and AS9120 standards and anyone can register for access, and a certificate that does not appear there is not recognized by the IAQG. Then read the certificate's scope and confirm it covers the work you are buying.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h3&gt;&#xD;
    &lt;span&gt;
          What is IA9100, and does it affect a certificate issued today?
         &lt;/span&gt;&#xD;
  &lt;/h3&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          IA9100 is the renamed and revised version of the AS9100 series, expected in 2026 or 2027 with a transition window running to roughly 2029 under IAQG guidance. Certificates today are issued against AS9100D, which remains the current certifiable revision, and existing certifications transition during that window rather than lapsing when the new document publishes.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;h2&gt;&#xD;
    &lt;span&gt;
          Put us through your own process
         &lt;/span&gt;&#xD;
  &lt;/h2&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
          If you are qualifying shops for an aluminum aerospace or defense program, the fastest way to find out whether we fit is to run us through the process you already have. Send the supplier questionnaire, or send the print and let the quote do the talking.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;
           
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
  &lt;p&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           Send us your supplier questionnaire by
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/start-your-rfq"&gt;
          starting your RFQ
         &lt;/a&gt;&#xD;
    &lt;span&gt;&#xD;
      &lt;span&gt;
           or
          &lt;/span&gt;&#xD;
    &lt;/span&gt;&#xD;
    &lt;a href="/contact"&gt;
          reaching out directly
         &lt;/a&gt;&#xD;
    &lt;span&gt;
          . Or call 270.820.7009.
         &lt;/span&gt;&#xD;
  &lt;/p&gt;&#xD;
&lt;/div&gt;</content:encoded>
      <enclosure url="https://irp.cdn-website.com/b2ffbbb7/dms3rep/multi/as9100-vs-iso-9001.jpg" length="56300" type="image/jpeg" />
      <pubDate>Mon, 21 Sep 2026 13:49:44 GMT</pubDate>
      <guid>https://www.standardmachine.us/insights/as9100-vs-iso-9001</guid>
      <g-custom:tags type="string" />
      <media:content medium="image" url="https://irp.cdn-website.com/b2ffbbb7/dms3rep/multi/as9100-vs-iso-9001.jpg">
        <media:description>thumbnail</media:description>
      </media:content>
      <media:content medium="image" url="https://irp.cdn-website.com/b2ffbbb7/dms3rep/multi/as9100-vs-iso-9001.jpg">
        <media:description>main image</media:description>
      </media:content>
    </item>
  </channel>
</rss>
